Bicycle garage (Atlas -1) maintenance alert
Attention cyclists! The Atlas -1 bicycle parking garage is getting some much-needed maintenance, which means temporary changes to access routes and facilities.

We want to keep you informed so you can plan ahead and avoid inconvenience. The work will take place in two phases, with specific entrances closed on different dates.
Changed Access Routes
- February 3–5, 2025: The south entrance to the bicycle parking garage will be closed. During this time, bicycles can only enter and exit through the western side entrance.
- February 6–7, 2025: The western side entrance will be closed. All bicycles must then use the south entrance.
To help with two-way bicycle traffic, a temporary bike gutter will be installed along the stairs. However, cargo bikes cannot safely access the bicycle parking garage during this period. Cyclists with cargo bikes can use the bicycle shed with a ramp located at Neuron.
Both entrances will be clearly cordoned off, and traffic diversion signs will be placed to guide you.
Secured Bicycle Parking and Charging Points
- The secured bicycle parking area inside the bicycle parking garage will not be accessible on February 6 and 7, 2025.
- The bicycle charging points will also be unavailable during these two days.
What’s Next?
Additional maintenance in the Atlas -1 bicycle parking garage is planned for March. During this time:
- The western side entrance will be closed for several weeks.
- The secured bicycle parking area will not be accessible for a number of weeks.
- The wheelchair lift will also be unavailable.
Further details, including exact dates, will be shared soon.
